{"id":81596,"date":"2024-10-17T18:56:20","date_gmt":"2024-10-17T18:56:20","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1610-2008\/"},"modified":"2024-10-24T19:47:17","modified_gmt":"2024-10-24T19:47:17","slug":"ieee-1610-2008","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1610-2008\/","title":{"rendered":"IEEE 1610 2008"},"content":{"rendered":"
New IEEE Standard – Active. This document specifies an exchange format, using XML, for identifying all of the hardware, software, and documentation associated with a unit under test (UUT). This UUT may be tested and diagnosed using a test program set (TPS) on an automatic test system (ATS).<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 1610-2007 Front Cover <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Introduction Notice to users Laws and regulations Copyrights Updating of IEEE documents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Errata Interpretations Patents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | IMPORTANT NOTICE 1. Overview 1.1 Scope 1.2 Purpose <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 2. Definitions <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 3. Three-phase 200 \/ 600 A underground distribution circuit considerations 3.1 General <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 3.2 Fault types <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 3.3 Reclosing, re-fusing, and inrush <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 3.4 Cold load pickup <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 3.5 Proximity effect <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 3.6 Sources of back-feed <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 4. Application of FCIs 4.1 Manual reset <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 4.2 Automatic reset <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5. Other considerations 5.1 Coordination 5.2 Placement 5.3 FCI display <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Annex A (informative) <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Annex B (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for the Application of Faulted Circuit Indicators for 200 \/ 600 A, Three-phase Underground Distribution<\/b><\/p>\n |