{"id":450596,"date":"2024-10-20T09:12:18","date_gmt":"2024-10-20T09:12:18","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-17607-42023\/"},"modified":"2024-10-26T17:09:52","modified_gmt":"2024-10-26T17:09:52","slug":"bs-iso-17607-42023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-17607-42023\/","title":{"rendered":"BS ISO 17607-4:2023"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4 Execution specification and quality requirements 4.1 General 4.2 Execution specification 5 Constituent products 5.1 General 5.2 Anchorages, foundation bolts and other anchorages 5.3 Grouting materials 5.3.1 General <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5.3.2 Cement-based grout 5.3.3 Special grout 5.3.4 Fine concrete 5.4 Expansion joints for bridges 6 Erection 6.1 General 6.2 Site conditions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 6.3 Erection method 6.3.1 Design basis for the erection method <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 6.3.2 Constructor’s erection method statement <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 6.4 Survey 6.4.1 Reference system 6.4.2 Position points 6.5 Supports 6.5.1 General 6.5.2 Measuring and documenting suitability of supports <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 6.5.3 Maintaining suitability of supports 6.5.4 Temporary supports 6.5.5 Grouting 6.5.6 Anchoring 6.6 Erection and work at site 6.6.1 Erection drawings <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 6.6.2 Marking 6.6.3 Handling and storage on site 6.6.4 Trial assembly 6.6.5 Erection methods <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 7 Geometrical tolerances <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 8 Inspection, testing and correction 8.1 General 8.2 Erection 8.2.1 Inspection of trial assembly 8.2.2 Inspection of the erected structure 8.2.3 Survey of geometrical position of connection nodes <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 8.2.4 Other acceptance tests 9 Documents required to claim conformity to this document 9.1 General 9.2 Declaration of conformity <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Annex A (normative) Additional information, list of options and requirements related to the execution levels <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Annex B (normative) Grouting <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Annex C (informative) Geometrical tolerances \u2014 Buildings <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | Annex D (informative) Geometrical tolerances \u2014 Bridges <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | Annex E (informative) Geometrical tolerances \u2014 Crane runways <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | Annex F (informative) Geometrical tolerances \u2014 Concrete foundations and supports <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Steel structures. Execution of structural steelwork – Erection<\/b><\/p>\n |