{"id":445378,"date":"2024-10-20T08:41:30","date_gmt":"2024-10-20T08:41:30","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iec-ts-63189-22023\/"},"modified":"2024-10-26T16:10:15","modified_gmt":"2024-10-26T16:10:15","slug":"bsi-pd-iec-ts-63189-22023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iec-ts-63189-22023\/","title":{"rendered":"BSI PD IEC TS 63189-2:2023"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | INTRODUCTION <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4 System requirements 4.1 General considerations 4.2 Basic requirements 4.2.1 General 4.2.2 Privacy 4.2.3 Cyber security 4.2.4 Adaptability, flexibility and interoperability <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.2.5 Communication and information 4.2.6 Reliability 4.3 Operational risks of VPPs 4.3.1 General 4.3.2 Major 4.3.3 Moderate 4.3.4 Minor <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5 Business roles 5.1 VPP participant 5.2 DER owner 5.3 System operator 5.4 Electricity market operator 6 Actors 7 Application scenarios and functions 7.1 Overview <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 7.2 Functions 8 VPP use case 8.1 Overview 8.2 Use case template 8.3 Use case matrix <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 8.4 Use case development 8.4.1 General Figure 1 \u2013 Use case matrix development methodology <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 8.4.2 Description of the use case Tables Table 1 \u2013 Use case list <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Table 2 \u2013 Scope and objectives of use case <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Table 3 \u2013 Narrative of use case <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Table 4 \u2013 Key performance indicators <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Table 5 \u2013 Use case conditions <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 8.4.3 Diagrams of use case Table 6 \u2013 Diagrams of use case <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 8.4.4 Technical details <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | Table 7 \u2013 Diagram(s) of actors <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Table 8 \u2013 Grouping of China <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Table 9 \u2013 Grouping of Japan <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Table 10 \u2013 Grouping of Australia <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Table 11 \u2013 Grouping of Germany Table 12 \u2013 References <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 8.4.5 Step by step analysis of use case Table 13 \u2013 Scenario conditions <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | Table 14 \u2013 Steps of scenarios <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | 8.4.6 Information exchanged Table 15 \u2013 Information exchanged <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | 9 Summary of standards gap analysis 10 Conclusion and recommendations <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | Table 16 \u2013 Conclusion of use cases <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Virtual Power Plants – Use Cases<\/b><\/p>\n |