{"id":440780,"date":"2024-10-20T08:17:26","date_gmt":"2024-10-20T08:17:26","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iec-60092-3032023-tc\/"},"modified":"2024-10-26T15:28:55","modified_gmt":"2024-10-26T15:28:55","slug":"bs-iec-60092-3032023-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iec-60092-3032023-tc\/","title":{"rendered":"BS IEC 60092-303:2023 – TC"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\n30479849 <\/td>\n<\/tr>\n
20<\/td>\nA-30438024 <\/td>\n<\/tr>\n
21<\/td>\nundefined <\/td>\n<\/tr>\n
23<\/td>\nCONTENTS <\/td>\n<\/tr>\n
24<\/td>\nFOREWORD <\/td>\n<\/tr>\n
26<\/td>\nINTRODUCTION <\/td>\n<\/tr>\n
27<\/td>\n1 Scope
2 Normative references <\/td>\n<\/tr>\n
28<\/td>\n3 Terms and definitions
4 Service conditions
4.1 Voltage and frequency <\/td>\n<\/tr>\n
29<\/td>\n4.2 Environmental condition
4.2.1 General
4.2.2 Vibration
4.2.3 Ambient temperature
4.3 Load current harmonic content
4.4 Transformers for special applications
4.4.1 Propulsion transformers
4.4.2 Transformers for shore-connection <\/td>\n<\/tr>\n
30<\/td>\n5 Design and construction
5.1 General
5.2 Materials
5.3 Insulation level, clearance and creepage distances
5.4 Degrees of protection of enclosures
5.5 Transformer winding arrangement <\/td>\n<\/tr>\n
31<\/td>\n5.6 Terminals
5.7 Cooling arrangements
6 Voltage regulation
7 Parallel operation
8 Transformers for essential services \u2013 Construction and documentation requirements
8.1 Cooling arrangements for essential services
8.1.1 General <\/td>\n<\/tr>\n
32<\/td>\n8.1.2 Cooling arrangements for secondary essential services
8.1.3 Cooling arrangements for primary essential services
8.2 Alert and monitoring
8.3 High voltage transformer
8.4 Documentation requirements
9 Tests <\/td>\n<\/tr>\n
33<\/td>\nAnnex A (informative)Method for reducing harmonics disturbances
Figure A.1 \u2013 Screen between primary and secondary winding
Figure A.2 \u2013 Phase shifting in transformers with multiple windings <\/td>\n<\/tr>\n
34<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Tracked Changes. Electrical installations in ships – Equipment. Power transformers and reactors<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2023<\/td>\n36<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":440787,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[791,2641],"product_tag":[],"class_list":{"0":"post-440780","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-47-020-60","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/440780","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/440787"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=440780"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=440780"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=440780"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}