{"id":426338,"date":"2024-10-20T07:01:30","date_gmt":"2024-10-20T07:01:30","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-12255-112023-tc\/"},"modified":"2024-10-26T13:16:48","modified_gmt":"2024-10-26T13:16:48","slug":"bs-en-12255-112023-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-12255-112023-tc\/","title":{"rendered":"BS EN 12255-11:2023 – TC"},"content":{"rendered":"

This document specifies data which is necessary for the planning, design, bidding, performance guarantees, construction, start-up and compliance testing of a wastewater treatment plant or parts of it. This document gives fundamental information about the practices; this document has not attempted to specify all available practices.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
28<\/td>\nundefined <\/td>\n<\/tr>\n
34<\/td>\n1 Scope
2 Normative references
3 Terms and definitions <\/td>\n<\/tr>\n
35<\/td>\n4 Symbols and abbreviations
5 Requirements
5.1 Contract strategy <\/td>\n<\/tr>\n
36<\/td>\n5.2 Provision of loading data
5.2.1 General
5.2.2 Sewerage system
5.2.3 Population served
5.2.4 Significant trades and industries <\/td>\n<\/tr>\n
37<\/td>\n5.2.5 Data from existing wastewater treatment plants <\/td>\n<\/tr>\n
38<\/td>\n5.2.6 Design flows and loads
5.3 Effluent quality, requirements for the disposal of residues and sludge
5.3.1 Effluent quality
5.3.2 Requirements for storm water overflow discharge <\/td>\n<\/tr>\n
39<\/td>\n5.3.3 Requirements for the residues from preliminary treatment
5.3.4 Requirements for sludge disposal
5.4 Site description
5.4.1 General
5.4.2 Plans (maps) of the site
5.4.3 Existing wastewater treatment plants <\/td>\n<\/tr>\n
40<\/td>\n5.4.4 Ground geology, groundwater and climate
5.4.5 Special site constraints
5.5 Additional data required <\/td>\n<\/tr>\n
41<\/td>\n5.6 Time schedule
5.7 Start-up and guarantee testing
5.7.1 Start-up <\/td>\n<\/tr>\n
42<\/td>\n5.7.2 Guarantee testing
5.8 Operational cost information
5.9 Documents to be provided by a turn-key contractor or the consulting engineer
5.9.1 Complete documents
5.9.2 Design options
5.9.3 Proposed solution <\/td>\n<\/tr>\n
43<\/td>\n5.10 Calculation and presentation of costs
5.10.1 Construction costs
5.10.2 Operational costs <\/td>\n<\/tr>\n
45<\/td>\n5.10.3 Presentation of costs <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Tracked Changes. Wastewater treatment plants – General data required<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2023<\/td>\n48<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":426348,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[214,2641],"product_tag":[],"class_list":{"0":"post-426338","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-13-060-30","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/426338","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/426348"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=426338"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=426338"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=426338"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}