{"id":426338,"date":"2024-10-20T07:01:30","date_gmt":"2024-10-20T07:01:30","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-12255-112023-tc\/"},"modified":"2024-10-26T13:16:48","modified_gmt":"2024-10-26T13:16:48","slug":"bs-en-12255-112023-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-12255-112023-tc\/","title":{"rendered":"BS EN 12255-11:2023 – TC"},"content":{"rendered":"
This document specifies data which is necessary for the planning, design, bidding, performance guarantees, construction, start-up and compliance testing of a wastewater treatment plant or parts of it. This document gives fundamental information about the practices; this document has not attempted to specify all available practices.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
28<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 4 Symbols and abbreviations 5 Requirements 5.1 Contract strategy <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 5.2 Provision of loading data 5.2.1 General 5.2.2 Sewerage system 5.2.3 Population served 5.2.4 Significant trades and industries <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 5.2.5 Data from existing wastewater treatment plants <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 5.2.6 Design flows and loads 5.3 Effluent quality, requirements for the disposal of residues and sludge 5.3.1 Effluent quality 5.3.2 Requirements for storm water overflow discharge <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 5.3.3 Requirements for the residues from preliminary treatment 5.3.4 Requirements for sludge disposal 5.4 Site description 5.4.1 General 5.4.2 Plans (maps) of the site 5.4.3 Existing wastewater treatment plants <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 5.4.4 Ground geology, groundwater and climate 5.4.5 Special site constraints 5.5 Additional data required <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 5.6 Time schedule 5.7 Start-up and guarantee testing 5.7.1 Start-up <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 5.7.2 Guarantee testing 5.8 Operational cost information 5.9 Documents to be provided by a turn-key contractor or the consulting engineer 5.9.1 Complete documents 5.9.2 Design options 5.9.3 Proposed solution <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 5.10 Calculation and presentation of costs 5.10.1 Construction costs 5.10.2 Operational costs <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 5.10.3 Presentation of costs <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Wastewater treatment plants – General data required<\/b><\/p>\n |