{"id":356348,"date":"2024-10-20T01:12:05","date_gmt":"2024-10-20T01:12:05","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-19202-12017\/"},"modified":"2024-10-26T01:34:31","modified_gmt":"2024-10-26T01:34:31","slug":"bs-iso-19202-12017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-19202-12017\/","title":{"rendered":"BS ISO 19202-1:2017"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4 List of significant hazards <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5 Safety requirements 5.1 Manufacturing 5.1.1 Materials 5.1.2 Safety measures against loosening of connections 5.1.3 Welded joints 5.1.4 Corrosion and surface protection, protection against rot <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.2 Toboggan 5.2.1 General 5.2.2 Toboggan for rail-guided summer toboggan runs 5.2.3 Toboggan for tub-guided summer toboggan runs <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.2.4 Braking 5.3 Track 5.3.1 Structural design of the system on the site 5.3.2 Rail-guided summer toboggan runs 5.3.3 Tub-guided summer toboggan runs <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.3.4 Visibility down the track and braking distances 5.4 Entrance and exit area 5.4.1 General <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.4.2 Entrance areas 5.4.3 End of downhill track 5.4.4 Exit areas 5.5 Uphill transport system 5.5.1 General 5.5.2 Technical design <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.5.3 Means of conveyance and connection to the means of conveyance 5.5.4 Tensioning devices 5.5.5 Drives and their components <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.6 Special safety equipment and precautions 5.7 Clearance zone 5.7.1 Downhill travel <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.7.2 Uphill transport 5.7.3 Squeezing and shearing points <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.8 Electrical equipment 5.8.1 Electrical systems 5.8.2 Control systems <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6 Calculations 6.1 General 6.2 Actions 6.2.1 General 6.2.2 Permanent actions <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 6.2.3 Variable actions <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6.2.4 Accidental actions 6.2.5 Impact <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 6.2.6 Vibrations occurring in directly passable components 6.3 Strength verification by calculation 6.3.1 General 6.3.2 Toboggan calculation <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 6.3.3 Tub calculation 6.3.4 Rail calculation 6.3.5 Calculation of supporting structure 6.3.6 Brake calculation <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 6.4 Verification of fatigue 6.4.1 General 6.4.2 Fatigue loads 6.5 Verification of stability 6.5.1 Safety against overturning, sliding and lifting off <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 6.5.2 Ground anchorages <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 7 Testing and inspection 7.1 General <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 7.2 Examination of the technical documentation 7.3 Acceptance test prior to commissioning (initial acceptance test) 7.3.1 General <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 7.3.2 Functional check <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 7.4 Periodic inspection 7.5 Inspection after modification 7.5.1 Examination of calculations 7.5.2 On-site inspection <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 7.6 Test report 8 Marking 8.1 Summer toboggan run <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 8.2 Toboggan 9 Commissioning 10 Technical documentation 10.1 General 10.2 Construction specification 10.3 Structural drawings and manufacturing drawings <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 10.4 Structural calculations 10.5 Risk assessment 10.6 Operating manual <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Annex\u00a0A (informative) Example of load combinations in accordance with EN\u00a01993 <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Annex\u00a0B (normative) Track calculation <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Summer toboggan runs – Safety requirements and test methods<\/b><\/p>\n |