{"id":197516,"date":"2024-10-19T12:34:18","date_gmt":"2024-10-19T12:34:18","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asa-s12-75-2012\/"},"modified":"2024-10-25T05:07:52","modified_gmt":"2024-10-25T05:07:52","slug":"asa-s12-75-2012","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asa\/asa-s12-75-2012\/","title":{"rendered":"ASA S12.75 2012"},"content":{"rendered":"
None<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
13<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4 Noise measurement instrumentation requirements 4.1 Noise recording systems 4.2 Microphones and preamplifiers 4.3 Recorder general requirements <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5 Measurement site 5.1 Terrain <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.2 Ground impedance 5.3 Weather requirements <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6 Noise measurement methods 6.1 Field test general methods <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 6.2 Aircraft performance measurement methods <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6.3 Conventional take-off and landing (CTOL) ground run-up methods <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 6.4 Short take-off\/vertical landing (STOVL) \/ Vertical take-off\/vertical landing \n (VTO\/VL) ground run-up methods <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 6.5 CTOL flyover noise methods <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 6.6 Short take-off\/short landing (STO\/SL) flyover noise methods <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 6.7 Vertical take-off\/vertical landing (VTO\/VL) flyover noise methods <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 7 Data analysis 7.1 Weather analysis 7.2 Spectrum analysis <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 7.3 Corrected spectral time histories 7.4 Weighted overall levels 7.5 Uncorrected pressure time histories \u2013 pressure vs. time 7.6 Aircraft tracking data 7.7 Aircraft performance histories 8 Reporting and test documentation 8.1 Calibration records 8.2 Weather data 8.3 Test log \/ scribe notes <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 8.4 Instrumentation set-up log 8.5 Test location data 8.6 Ground impedance data 8.7 Aircraft performance data 8.8 Aircraft tracking data 8.9 Raw noise measurement data 8.10 Reduced noise data <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Annex A (normative) Measurement uncertainty for ground run-up noise methods A.1 Measurement uncertainty <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Annex B (normative) Measurement uncertainty for flyover noise methods B.1 Measurement uncertainty <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Annex C (informative) Microphone cable length considerations <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Annex D (informative) Conventional flight procedure communication protocols <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | Annex E (normative) Obstructions and reflections E.1 Obstructions E.2 Field reflections check <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | Annex F (informative) Spectral smearing with low-level flyovers F.1 Source angle smearing <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | Annex G (informative) Elevated microphones \u2013 direct vs. reflected waves <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | Annex H (informative) Weather analysis: Corrections for atmospheric absorption for flyover <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ANSI\/ASA S12.75-2012 American National Standard Methods for the Measurement of Noise Emissions from High Performance Military Jet Aircraft<\/b><\/p>\n |