Shopping Cart

No products in the cart.

BSI PD IEC/TS 61400-26-3:2016

$245.25

Wind energy generation systems – Availability for wind power stations

Published By Publication Date Number of Pages
BSI 2016 122
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

IEC TS 61400-26-3:2016(E) provides a framework from which time-based and production-based availability indicators of a wind power station can be derived. It unambiguously describes how data is categorised and provides examples of how the data can be used to derive availability indicators. The approach is to apply the terms and definitions for the applied information models introduced in IEC TS 61400-26-1 and IEC TS 61400-26-2 to a wind power station.

PDF Catalog

PDF Pages PDF Title
4 CONTENTS
10 FOREWORD
12 INTRODUCTION
Figures
Figure 1 – Data stakeholders for a wind power station
14 1 Scope
2 Normative references
15 3 Terms, definitions and abbreviations
3.1 Terms and definitions
16 3.2 Abbreviations for ‘Information available’
18 3.3 Abbreviations for ‘Information unavailable’
19 4 Information model for WPS
4.1 General
Figure 2 – Information category overview for a WPS
20 4.2 Services
21 Figure 3 – Example of a model split-up in active power, reactive power high and low frequency compensation services
22 4.3 Information category priority
4.4 Information model for BOP
Figure 4 – Information category priority for WPS
23 5 INFORMATION AVAILABLE (WPS)
5.1 General
24 5.2 OPERATIVE
Figure 5 – Mandatory INFORMATION AVAILABLE categories for WPS
25 5.3 IN SERVICE
Figure 6 – OPERATIVE category
26 Figure 7 – IN SERVICE category
Figure 8 – FULL PERFORMANCE category
27 Figure 9 – PARTIAL PERFORMANCE category
28 5.4 OUT OF SERVICE
Figure 10 – READY STANDBY category
29 Figure 11 – OUT OF SERVICE category
30 Figure 12 – TECHNICAL STANDBY category
Figure 13 – OUT OF ENVIRONMENTAL SPECIFICATION category
31 Figure 14 – REQUESTED SHUTDOWN category
32 5.5 NON-OPERATIVE
Figure 15 – OUT OF ELECTRICAL SPECIFICATION category
33 Figure 16 – NON-OPERATIVE category
Figure 17 – SCHEDULED MAINTENANCE category
34 Figure 18 – PLANNED CORRECTIVE ACTION category
35 Figure 19 – FORCED OUTAGE category
36 5.6 FORCE MAJEURE
Figure 20 – SUSPENDED category
37 6 INFORMATION UNAVAILABLE (WPS)
Figure 21 – FORCE MAJEURE category
38 Figure 22 – INFORMATION UNAVAILABLE category
39 Annexes
Annex A (informative) Entry and Exit condition overview
Figure A.1 – Overview of the entry and exit conditions of all mandatory information categories described in this document
40 Annex B (informative) Application scenarios – examples
B.1 Overview
B.2 Application scenarios
B.2.1 Example 1: Normal operation – all WPS
Tables
Table B.1 – Scenario, Example 1: Normal operation – all WPS
41 B.2.2 Example 2: Normal operation – part of WPS
Table B.2 – Scenario, Example 2: Normal operation – part of WPS
42 B.2.3 Example 3: Dirty WTGSs blades – all WPS
43 B.2.4 Example 4: Dirty WTGSs blades – part of WPS
Table B.3 – Scenario, Example 3: Dirty WTGSs blades – all WPS
44 B.2.5 Example 5: BOP limitations – all WPS
Table B.4 – Scenario, Example 4: Dirty WTGSs blades – part of WPS
45 B.2.6 Example 6: BOP limitations – part of WPS
Table B.5 – Scenario, Example 5: BOP limitations – all WPS
46 B.2.7 Example 7: ‘Spinning reserve’ – all WPS
Table B.6 – Scenario, Example 6: BOP limitations – part of WPS
47 Table B.7 – Scenario, Example 7: ‘Spinning reserve’ – all WPS
48 B.2.8 Example 8: ‘Spinning reserve’ – part of WPS
Table B.8 – Scenario, Example 8: ‘Spinning reserve’ – part of WPS
49 B.2.9 Example 9: Noise restrictions – Warranty related
Table B.9 – Scenario, Example 9: Noise restrictions – all WPS
50 B.2.10 Example 10: Noise restrictions – environmentally related
Table B.10 – Scenario, Example 10: Noise restrictions – all WPS
51 B.2.11 Example 11: Ice storm on Grid – all WPS
Table B.11 – Scenario, Example 11: Ice storm on Grid – all WPS
53 Annex C (informative) Balance of plant integration
C.1 WPS functions and services
C.2 Externally required functions and services
C.3 Internally required functions and services
C.4 Expansion of the Information Model for BOP functions and services
55 Annex D (informative) Determination of potential production for a WPS – examples
D.1 Overview
D.2 Primary service
D.3 Secondary services
56 Table D.1 – Examples on how to determine Potential production
57 Annex E (informative) Service availability indicators – examples
E.1 Overview
E.2 Time based WPS availability
E.2.1 General
E.2.2 Operational service availability (“TSO’s view”)
58 E.2.3 Operational service availability (“WPS operator’s view”)
59 E.2.4 Technical service availability (“WPS maintenance provider’s view”)
60 E.3 Production-based service availability indicators – examples
E.3.1 Overview
E.3.2 System operational production-based availability (“WPS operator’s view”)
61 E.3.3 System operational production-based availability (“TSO’s view”)
62 E.3.4 System operational production-based availability (“WPS maintenance provider’s view”)
64 Annex F (informative) Examples of optional level 5 categories
F.1 Overview
F.2 Example of level 5 definitions
F.2.1 General
Table F.1 – Example of level 5 definitions
66 F.2.2 NOT CURTAILED
67 F.2.3 NOT CURTAILED – WARNING
Table F.2 – NOT CURTAILED category
Table F.3 – NOT CURTAILED – WARNING category
68 F.2.4 UP-RATED
F.2.5 DERATED – OTHER
Table F.4 – UP-RATED category
69 F.2.6 DERATED – GRID WPS OPERATOR
Table F.5 – DERATED – OTHER category
70 F.2.7 DERATED – GRID TSO
Table F.6 – DERATED – GRID WPS OPERATOR category
71 F.2.8 DERATED – GRID CONTROL
Table F.7 – DERATED – GRID TSO category
72 F.2.9 DERATED – NOISE
Table F.8 – DERATED – GRID CONTROL category
73 F.2.10 DERATED – TEMPERATURE
Table F.9 – DERATED – NOISE category
74 F.2.11 DERATED – STRUCTURAL LOAD
Table F.10 – DERATED – TEMPERATURE category
75 F.2.12 DERATED – WIND
Table F.11 – DERATED – STRUCTURAL LOAD category
76 F.2.13 DEGRADED – OTHER
Table F.12 – DERATED – WIND category
77 F.2.14 DEGRADED – DIAGNOSTIC
Table F.13 – DEGRADED – OTHER category
78 F.2.15 DEGRADED – NOISE
Table F.14 – DEGRADED – DIAGNOSTIC category
79 F.2.16 DEGRADED – COMPONENT
Table F.15 – DEGRADED – NOISE category
80 F.2.17 DEGRADED – TEMPERATURE
Table F.16 – DEGRADED – COMPONENT category
81 F.2.18 DEGRADED – STRUCTURAL LOAD
Table F.17 – DEGRADED – TEMPERATURE category
82 F.2.19 OTHER READY STANDBY
Table F.18 – DEGRADED – STRUCTURAL LOAD category
83 F.2.20 OTHER TECHNICAL STANDBY
F.2.21 LUBRICATION
Table F.19 – OTHER READY STANDBY category
Table F.20 – OTHER TECHNICAL STANDBY category
84 F.2.22 DE-ICING
F.2.23 DRY OUT
Table F.21 – LUBRICATION category
Table F.22 – DE-ICING category
85 F.2.24 CABLE UNTWIST
Table F.23 – DRY OUT category
Table F.24 – CABLE UNTWIST category
86 F.2.25 OTHER ENVIRONMENTAL
F.2.26 CALM WINDS
Table F.25 – OTHER ENVIRONMENTAL category
Table F.26 – CALM WINDS category
87 F.2.27 HIGH WIND
F.2.28 TEMPERATURE
Table F.27 – HIGH WIND category
Table F.28 – TEMPERATURE category
88 F.2.29 OTHER REQUESTED SHUTDOWN
F.2.30 ENVIRONMENTAL
Table F.29 – OTHER REQUESTED SHUTDOWN category
89 F.2.31 GRID – WPS OPERATOR
Table F.30 – ENVIRONMENTAL category
Table F.31 – GRID – WPS OPERATOR category
90 F.2.32 GRID – TSO
F.2.33 NOISE
Table F.32 – GRID – TSO category
91 F.2.34 FLICKER
Table F.33 – NOISE category
Table F.34 – FLICKER category
92 F.2.35 WILDLIFE
F.2.36 STRUCTURAL LOAD
Table F.35 – WILDLIFE category
93 F.2.37 OTHER OUT OF ELECTRICAL SPECIFICATION
Table F.36 – STRUCTURAL LOAD category
Table F.37 – OTHER OUT OF ELECTRICAL SPECIFICATION category
94 F.2.38 FREQUENCY
F.2.39 VOLTAGE LEVEL LOW
Table F.38 – FREQUENCY category
Table F.39 – VOLTAGE LEVEL LOW category
95 F.2.40 VOLTAGE LEVEL HIGH
F.2.41 ASYMMETRY
Table F.40 – VOLTAGE LEVEL HIGH category
Table F.41 – ASYMMETRY category
96 F.2.42 SCHEDULED MAINTENANCE
F.2.43 OTHER CORRECTIVE ACTION
Table F.42 – SCHEDULED MAINTENANCE category
Table F.43 – OTHER CORRECTIVE ACTION category
97 F.2.44 UPGRADE
F.2.45 INSPECTIONS
Table F.44 – UPGRADE category
Table F.45 – INSPECTIONS category
98 F.2.46 RETROFIT
F.2.47 REPAIR WORK
Table F.46 – RETROFIT category
Table F.47 – REPAIR WORK category
99 F.2.48 OTHER FORCED OUTAGE
F.2.49 FAILURE REPAIR
Table F.48 – OTHER FORCED OUTAGE category
100 F.2.50 DIAGNOSTIC
Table F.49 – FAILURE REPAIR category
Table F.50 – DIAGNOSTIC category
101 F.2.51 LOGISTIC WPS MAINTENANCE PROVIDER
F.2.52 LOGISTIC WPS OPERATOR
Table F.51 – LOGISTIC WPS MAINTENANCE PROVIDER category
102 F.2.53 RESPONSE WPS MAINTENANCE PROVIDER
Table F.52 – LOGISTIC WPS OPERATOR category
Table F.53 – RESPONSE WPS MAINTENANCE PROVIDER category
103 F.2.54 RESPONSE WPS OPERATOR
F.2.55 OTHER SUSPENDED – SCHEDULED MAINTENANCE
Table F.54 – RESPONSE WPS OPERATOR category
104 F.2.56 PERSONNEL SAFETY – SCHEDULED MAINTENANCE
Table F.55 – OTHER SUSPENDED – SCHEDULED MAINTENANCE category
105 F.2.57 ENVIRONMENT – SCHEDULED MAINTENANCE
Table F.56 – PERSONNEL SAFETY – SCHEDULED MAINTENANCE category
106 F.2.58 IT ACCESS – SCHEDULED MAINTENANCE
Table F.57 – ENVIRONMENT – SCHEDULED MAINTENANCE category
107 F.2.59 OTHER SUSPENDED – PLANNED CORRECTIVE ACTION
Table F.58 – IT ACCESS – SCHEDULED MAINTENANCE category
108 F.2.60 PERSONNEL SAFETY – PLANNED CORRECTIVE ACTION
Table F.59 – OTHER SUSPENDED – PLANNED CORRECTIVE ACTION category
109 F.2.61 ENVIRONMENT – PLANNED CORRECTIVE ACTION
Table F.60 – PERSONNEL SAFETY – PLANNED CORRECTIVE ACTION category
110 F.2.62 IT ACCESS – PLANNED CORRECTIVE ACTION
Table F.61 – ENVIRONMENT – PLANNED CORRECTIVE ACTION category
111 F.2.63 OTHER SUSPENDED – FORCED OUTAGE
Table F.62 – IT ACCESS – PLANNED CORRECTIVE ACTION category
112 F.2.64 PERSONNEL SAFETY – FORCED OUTAGE
Table F.63 – OTHER SUSPENDED – FORCED OUTAGE category
113 F.2.65 ENVIRONMENT – FORCED OUTAGE
Table F.64 – PERSONNEL SAFETY – FORCED OUTAGE category
114 F.2.66 IT ACCESS – FORCED OUTAGE
Table F.65 – ENVIRONMENT – FORCED OUTAGE category
115 F.2.67 INACTIVE RESERVE
Table F.66 – IT ACCESS – FORCED OUTAGE category
116 F.2.68 MOTHBALLED
Table F.67 – INACTIVE RESERVE category
117 F.2.69 RETIRED
Table F.68 – MOTHBALLED category
118 F.2.70 FORCE MAJEURE
Table F.69 – RETIRED category
119 F.2.71 INFORMATION UNAVAILABLE
Table F.70 – FORCE MAJEURE category
Table F.71 – INFORMATION UNAVAILABLE category
120 Bibliography
BSI PD IEC/TS 61400-26-3:2016
$245.25