BSI 23/30469482 DC 2023
$13.70
BS EN IEC 62040-1. Uninterruptible power systems (UPS) – Part 1. Safety requirements
Published By | Publication Date | Number of Pages |
BSI | 2023 | 63 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
7 | FOREWORD |
9 | INTRODUCTION |
10 | 1 Scope |
11 | 2 Normative references 3 Terms and definitions 3.101 |
17 | 4 Protection against hazards 4.2 Single fault conditions and abnormal operating conditions 4.3 Short-circuit and overload protection 4.3.1 General |
18 | 4.3.1.101 UPS input port with low impedance path to output port 4.3.1.102 UPS input port with no low impedance path to output port 4.3.2 Input short-circuit withstand strength 4.3.2.1 4.3.2.2 Conditional short-circuit current (Icc) on input ports 4.3.2.3 Short-time withstand current (Icw) on input ports |
19 | 4.3.2.4 Output short-circuit current ability 4.3.3 4.3.4 Protection by several devices 4.3.5 4.3.6 4.3.7 4.3.8 4.3.9 4.3.10 4.3.11 4.3.12 4.3.13 4.3.14 4.3.15 4.3.16 4.3.17 4.3.18 4.3.19 4.3.20 4.3.21 4.3.22 4.3.23 4.3.24 4.3.25 4.3.26 4.3.27 4.3.28 4.3.29 4.3.30 4.3.31 4.3.32 4.3.33 4.3.34 4.3.35 4.3.36 4.3.37 4.3.38 4.3.39 4.3.40 4.3.41 4.3.42 4.3.43 4.3.44 4.3.45 4.3.46 4.3.47 4.3.48 4.3.49 4.3.50 4.3.51 4.3.52 4.3.53 4.3.54 4.3.55 4.3.56 4.3.57 4.3.58 4.3.59 4.3.60 4.3.61 4.3.62 4.3.63 4.3.64 4.3.65 4.3.66 4.3.67 4.3.68 4.3.69 4.3.70 4.3.71 4.3.72 4.3.73 4.3.74 4.3.75 4.3.76 4.3.77 4.3.78 4.3.79 4.3.80 4.3.81 4.3.82 4.3.83 4.3.84 4.3.85 4.3.86 4.3.87 4.3.88 4.3.89 4.3.90 4.3.91 4.3.92 4.3.93 4.3.94 4.3.95 4.3.96 4.3.97 4.3.98 4.3.99 4.3.100 4.3.101 AC input current 4.3.102 Transformer protection 4.3.103 Protection of the energy storage device |
20 | 4.3.104 Unsynchronised load transfer 4.4 4.4.1 4.4.2 4.4.2.1 General 4.4.3 Means for basic protection (protection against direct contact) 4.4.3.3 Protection by means of enclosures or barriers 4.4.3.101 Openings in enclosures |
21 | 4.4.3.102 Restricted access areas 4.4.4 4.4.4.1 4.4.4.2 Protective equipotential bonding (circuit) 4.4.4.2.1 4.4.4.2.2 4.4.4.2.3 4.4.4.2.4 4.4.4.2.5 4.4.4.2.6 4.4.4.2.7 4.4.4.2.8 4.4.4.2.9 4.4.4.2.10 4.4.4.2.11 4.4.4.2.12 4.4.4.2.13 4.4.4.2.14 4.4.4.2.15 4.4.4.2.16 4.4.4.2.17 4.4.4.2.18 4.4.4.2.19 4.4.4.2.20 4.4.4.2.21 4.4.4.2.22 4.4.4.2.23 4.4.4.2.24 4.4.4.2.25 4.4.4.2.26 4.4.4.2.27 4.4.4.2.28 4.4.4.2.29 4.4.4.2.30 4.4.4.2.31 4.4.4.2.32 4.4.4.2.33 4.4.4.2.34 4.4.4.2.35 4.4.4.2.36 4.4.4.2.37 4.4.4.2.38 4.4.4.2.39 4.4.4.2.40 4.4.4.2.41 4.4.4.2.42 4.4.4.2.43 4.4.4.2.44 4.4.4.2.45 4.4.4.2.46 4.4.4.2.47 4.4.4.2.48 4.4.4.2.49 4.4.4.2.50 4.4.4.2.51 4.4.4.2.52 4.4.4.2.53 4.4.4.2.54 4.4.4.2.55 4.4.4.2.56 4.4.4.2.57 4.4.4.2.58 4.4.4.2.59 4.4.4.2.60 4.4.4.2.61 4.4.4.2.62 4.4.4.2.63 4.4.4.2.64 4.4.4.2.65 4.4.4.2.66 4.4.4.2.67 4.4.4.2.68 4.4.4.2.69 4.4.4.2.70 4.4.4.2.71 4.4.4.2.72 4.4.4.2.73 4.4.4.2.74 4.4.4.2.75 4.4.4.2.76 4.4.4.2.77 4.4.4.2.78 4.4.4.2.79 4.4.4.2.80 4.4.4.2.81 4.4.4.2.82 4.4.4.2.83 4.4.4.2.84 4.4.4.2.85 4.4.4.2.86 4.4.4.2.87 4.4.4.2.88 4.4.4.2.89 4.4.4.2.90 4.4.4.2.91 4.4.4.2.92 4.4.4.2.93 4.4.4.2.94 4.4.4.2.95 4.4.4.2.96 4.4.4.2.97 4.4.4.2.98 4.4.4.2.99 4.4.4.2.100 4.4.4.2.101 Protective bonding |
22 | 4.4.5 4.4.6 4.4.6.1 4.4.6.2 4.4.6.3 Protective means for PECS designed as class II equipment 4.4.7 4.4.7.1 4.4.7.1.1 4.4.7.1.2 4.4.7.1.3 Pollution degree 4.4.7.1.4 Overvoltage category (OVC) 4.4.7.2 4.4.7.2.1 4.4.7.2.2 4.4.7.2.3 Circuits connected directly to mains supply |
23 | 4.4.8 4.4.9 Capacitor discharge 4.5 4.5.1 4.5.2 Service access areas 4.6 4.6.1 4.6.2 4.6.3 4.6.3.1 General |
24 | 4.6.3.2 4.6.3.3 4.6.3.3.1 4.6.3.3.2 Openings in the top and side of fire enclosures 4.6.4 4.6.4.1 4.6.4.2 Internal parts |
25 | 4.6.5 Limited power sources 4.7 4.8 PECS with multiple sources of supply 4.8.101 Backfeed protection |
26 | 4.9 4.10 4.11 4.11.1 4.11.2 4.11.3 4.11.4 4.11.5 4.11.6 4.11.7 4.11.8 4.11.9 4.11.10 4.11.10.1 4.11.10.2 Connecting capacity 4.12 4.13 4.13.1 4.13.2 4.13.3 4.13.4 Capacitors and RC units bridging insulation |
27 | 4.101 UPS isolation and disconnect devices 4.101.1 Emergency switching (disconnect) device 4.101.2 Normal disconnect devices 4.102 Energy storage device 4.102.1 General |
28 | 4.102.2 Accessibility and maintainability 4.102.3 Distance between battery cells 4.102.4 Case insulation 4.102.5 Electrolyte spillage 4.102.6 Ventilation and hydrogen concentration (lead acid and nickel cadmium batteries) |
29 | 4.102.7 Charging voltages 4.102.8 Battery circuit protection 4.102.8.1 Overcurrent and earth fault protection 4.102.8.2 Location of protective devices 4.102.8.3 Rating of protective devices 4.102.9 Lithium ion batteries 4.102.9.1 General |
30 | 4.102.9.2 Battery system safety (functional safety) 4.102.9.3 Packaging and transport 4.103 UPS connection to telecommunication lines 5 Test requirements 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.1.5.1 5.1.5.2 5.1.5.3 Operating parameters for tests |
31 | 5.2 5.2.1 5.2.2 5.2.2.1 5.2.2.2 Non-accessibility test (type test) 5.2.2.2.101 Non accessibility test in restricted access areas 5.2.2.3 5.2.2.4 5.2.2.4.1 5.2.2.4.2 5.2.2.4.3 5.2.2.4.4 Drop test (type test) 5.2.3 Electrical tests 5.2.3.1 5.2.3.2 5.2.3.3 5.2.3.4 5.2.3.5 5.2.3.6 5.2.3.7 5.2.3.8 5.2.3.9 5.2.3.10 Temperature rise test (type test) 5.2.3.11 5.2.3.12 Input test (type test) |
32 | 5.2.3.101 Backfeed protection test (type test) 5.2.3.101.1 General 5.2.3.101.2 Test for pluggable UPS 5.2.3.101.3 Test for permanently connected UPS |
33 | 5.2.3.101.4 Method to simulate the load-induced change of reference potential for pluggable UPS |
34 | 5.2.3.101.5 Solid-state backfeed protection 5.2.4 Abnormal operation and simulated faults tests 5.2.4.1 General 5.2.4.2 Acceptance criteria |
35 | 5.2.4.3 5.2.4.4 Short-circuit withstand test (type test) 5.2.4.4.1 Load conditions 5.2.4.4.2 Short-circuit test method 5.2.4.4.2.101 AC input port rated conditional short-circuit current 5.2.4.4.2.102 AC input port rated short-time withstand current 5.2.4.4.3 5.2.4.4.3.1 5.2.4.4.3.2 Short-time withstand current test method |
37 | 5.2.4.4.101 Exemption from testing 5.2.4.101 Transformer protection test |
39 | 5.2.4.102 Unsynchronised load transfer test 5.2.4.102.1 General 5.2.4.102.2 Phase displacement 6 Information and marking requirements 6.1 6.2 6.2.1 6.2.1.1 6.2.1.2 6.2.1.3 6.2.1.4 Supplementary information for each port 6.2.101 Guidance on UPS installation |
40 | 6.3 6.4 6.4.1 6.4.2 6.4.3 Labels, signs, symbols and signals 6.4.3.1 6.4.3.2 6.4.3.3 6.4.3.4 6.4.3.5 6.4.3.6 6.4.3.7 6.4.3.8 6.4.3.9 6.4.3.10 6.4.3.11 6.4.3.12 6.4.3.13 6.4.3.14 6.4.3.15 6.4.3.16 6.4.3.17 6.4.3.18 6.4.3.19 6.4.3.20 6.4.3.21 6.4.3.22 6.4.3.23 6.4.3.24 6.4.3.25 6.4.3.26 6.4.3.27 6.4.3.28 6.4.3.29 6.4.3.30 6.4.3.31 6.4.3.32 6.4.3.33 6.4.3.34 6.4.3.35 6.4.3.36 6.4.3.37 6.4.3.38 6.4.3.39 6.4.3.40 6.4.3.41 6.4.3.42 6.4.3.43 6.4.3.44 6.4.3.45 6.4.3.46 6.4.3.47 6.4.3.48 6.4.3.49 6.4.3.50 6.4.3.51 6.4.3.52 6.4.3.53 6.4.3.54 6.4.3.55 6.4.3.56 6.4.3.57 6.4.3.58 6.4.3.59 6.4.3.60 6.4.3.61 6.4.3.62 6.4.3.63 6.4.3.64 6.4.3.65 6.4.3.66 6.4.3.67 6.4.3.68 6.4.3.69 6.4.3.70 6.4.3.71 6.4.3.72 6.4.3.73 6.4.3.74 6.4.3.75 6.4.3.76 6.4.3.77 6.4.3.78 6.4.3.79 6.4.3.80 6.4.3.81 6.4.3.82 6.4.3.83 6.4.3.84 6.4.3.85 6.4.3.86 6.4.3.87 6.4.3.88 6.4.3.89 6.4.3.90 6.4.3.91 6.4.3.92 6.4.3.93 6.4.3.94 6.4.3.95 6.4.3.96 6.4.3.97 6.4.3.98 6.4.3.99 6.4.3.100 6.4.3.101 Distribution-related backfeed 6.4.3.102 Protection in building installation 6.4.3.102.1 General |
41 | 6.4.3.102.2 Rated conditional short-circuit current (Icc) 6.4.3.102.3 Prospective short-circuit current (Icp) |
42 | 6.4.3.102.4 Requirement for building installation 6.4.3.103 Batteries installed within the UPS enclosure |
43 | 6.5 Supplementary information 6 6.5.1 6.5.2 Capacitor discharge 6.5.3 6.5.4 6.5.5 6.5.6 6.5.7 6.5.8 6.5.9 6.5.10 6.5.11 6.5.12 6.5.13 6.5.14 6.5.15 6.5.16 6.5.17 6.5.18 6.5.19 6.5.20 6.5.21 6.5.22 6.5.23 6.5.24 6.5.25 6.5.26 6.5.27 6.5.28 6.5.29 6.5.30 6.5.31 6.5.32 6.5.33 6.5.34 6.5.35 6.5.36 6.5.37 6.5.38 6.5.39 6.5.40 6.5.41 6.5.42 6.5.43 6.5.44 6.5.45 6.5.46 6.5.47 6.5.48 6.5.49 6.5.50 6.5.51 6.5.52 6.5.53 6.5.54 6.5.55 6.5.56 6.5.57 6.5.58 6.5.59 6.5.60 6.5.61 6.5.62 6.5.63 6.5.64 6.5.65 6.5.66 6.5.67 6.5.68 6.5.69 6.5.70 6.5.71 6.5.72 6.5.73 6.5.74 6.5.75 6.5.76 6.5.77 6.5.78 6.5.79 6.5.80 6.5.81 6.5.82 6.5.83 6.5.84 6.5.85 6.5.86 6.5.87 6.5.88 6.5.89 6.5.90 6.5.91 6.5.92 6.5.93 6.5.94 6.5.95 6.5.96 6.5.97 6.5.98 6.5.99 6.5.100 6.5.101 6.5.102 Battery information for maintenance 6.5.102.1 Labelling on battery 6.5.102.2 Information in instruction manual(s) 6.5.102.2.1 General |
44 | 6.5.102.2.2 Instructions for battery replacement |
45 | Annexes |
46 | A.101 Comparison of limits of working voltage |
47 | Annex M (normative) Test probes for determining access |
48 | Annex AA (informative) Minimum and maximum cross-section of copper cables suitable for connection to terminals for external cables |
49 | Annex BB (informative) Reserved for future use |
50 | Annex CC (normative) Ventilation of lead-acid battery compartments CC.1 General CC.2 Normal conditions |
52 | CC.3 Blocked conditions |
53 | Annex DD (informative) Guidance for disconnection of batteries during shipment DD.1 Applicable products DD.2 Battery disconnection DD.3 Package labelling/marking |
54 | DD.4 Damage inspection DD.5 The importance of safe handling procedures |
55 | Annex EE (informative) Short-time withstand current test procedure – Guidance and typical values EE.1 General |
57 | EE.2 Test set up EE.3 Calibration of the test circuit |
58 | EE.4 Test procedure EE.5 Test verification criteria |
59 | Annex FF (informative) Maximum heating effect in transformer tests FF.1 Determination of maximum input current |
60 | FF.2 Overload test procedure |
61 | Annex GG (normative) Requirements for the mounting means of rack-mounted equipment GG.1 General GG.2 Mechanical strength test, variable force |
62 | GG.3 Mechanical strength test, 250 N force, including end stops GG.4 Compliance |