BS ISO 21368:2022 – TC
$280.87
Tracked Changes. Adhesives. Guidelines for the fabrication of adhesively bonded structures and reporting procedures suitable for the risk evaluation of such structures
Published By | Publication Date | Number of Pages |
BSI | 2022 | 242 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | 30456927 |
131 | A-30388669 |
132 | National foreword |
138 | Foreword |
139 | Introduction |
141 | 1 Scope |
142 | 2 Normative references 3 Terms and definitions |
149 | 4 Core element 1: Classification of adhesively bonded joints according to safety requirements 4.1 General |
150 | 4.2 Definition of safety classes |
151 | 4.3 Documentation of the classification according to safety classes 5 Core element 2: Adhesive bonding personnel (ABP)— Competences, knowledge and experiences 5.1 General |
152 | 5.2 Adhesive bonding operators (ABO) 5.2.1 General 5.2.2 Functions 5.2.3 Duties 5.2.4 Competences, knowledge and experiences |
153 | 5.3 Adhesive bonding coordinator (ABC) 5.3.1 General 5.3.2 Functions 5.3.3 Duties |
156 | 5.3.4 Competences 5.3.5 Organizational integration of adhesive bonding coordination |
157 | 5.4 Levels of competences, knowledge and experiences for adhesive bonding personnel (ABP) 5.4.1 General 5.4.2 Requirements for each level of competences, knowledge and experiences |
159 | 5.5 Assignment of the three competence levels to the safety classes depending on the respective scope of work — Correlation of the core elements |
160 | 5.6 Comparability of competences, knowledge and experience 5.7 Monitoring, inspection and testing personnel 6 Core element 3: Design and verification of adhesively bonded joints 6.1 General 6.2 Assignment to safety classes |
161 | 6.3 Requirements to be met by the adhesively bonded joints 6.4 Design of adhesively bonded joints 6.5 Adherends 6.6 Adhesive |
162 | 6.7 Surface treatment 6.8 Factors affecting the adhesive bonding process 6.9 Verification 6.9.1 General 6.9.2 Method 1 — Load in use < maximum load capacity |
163 | 6.9.3 Method 2 — Component testing 6.9.4 Method 3 — Documented experience 6.9.5 Method 4 — Combination of methods 1 to 3 7 Drafting contracts and subcontracting (outsourcing) 7.1 General |
164 | 7.2 Subcontracting (Outsourcing) 7.2.1 General |
165 | 7.2.2 Deciding on subcontracting 7.2.3 Details and documentation of procurement 7.2.4 Selection of external service provider (subcontractor/supplier) and contracting |
166 | 7.2.5 Management of external service providers (subcontractors/suppliers) 8 Workmanship 8.1 General 8.2 General process requirements 8.2.1 Production planning 8.2.2 Process design |
167 | 8.2.3 Planning the use of production aids and tools |
168 | 8.2.4 Production documents 8.2.5 Process approval 8.2.6 Transport, storage and logistics for adhesives, auxiliary materials and adherends |
169 | 8.2.7 Production environment |
170 | 8.2.8 Materials 8.2.9 Preparation of work stations and acclimatization of materials |
171 | 8.2.10 Health and safety and environmental protection 8.2.11 Checking for fitting accuracy concerning shape, position and dimension 8.2.12 Checks prior to start of production |
172 | 8.2.13 Treatment of the adherend surfaces |
173 | 8.2.14 Dosing, mixing and application |
174 | 8.2.15 Inspection and testing during adhesive bonding and adhesive solidification 8.2.16 Joining the adherends |
175 | 8.2.17 Fixing 8.2.18 Solidification of the adhesive |
176 | 8.2.19 Inspection and testing of finished components 8.2.20 Packaging and transport of adhesively bonded components 8.3 Work instructions: minimum requirements |
178 | 8.4 Process reliability 8.4.1 General 8.4.2 Quality planning 8.4.3 Control of planning and manufacturing documents 8.4.4 Process validation |
179 | 8.4.5 Production-accompanying work samples as proof of application quality |
180 | 8.4.6 Quality control of process reliability/traceability |
181 | 8.4.7 Instruction of adhesive bonding personnel (ABP) 8.4.8 Post-adhesive bonding finishing 8.5 Rework 8.6 Quality assurance 8.6.1 General 8.6.2 Quality planning |
182 | 8.6.3 Quality inspection 8.6.4 Action in the case of deviations |
183 | 8.6.5 Monitoring of measuring and test equipment and of production aids and tools 8.6.6 Imperfections in adhesively bonded joints 8.6.7 Control of non-conforming products |
184 | 8.6.8 Preventive and corrective action 9 Maintenance and repair 9.1 General 9.2 Planning of maintenance and repair |
185 | 9.3 Maintenance and repair instructions 9.4 Performing maintenance work/execution rules |
186 | 9.5 Documentation 9.6 Sub-contracting |
187 | Annex A (informative) Assistance for providing adhesive bonding technology competences |
204 | Annex B (informative) Requirements |
205 | Annex C (informative) Guideline for the implementation of the design of adhesively bonded joints and its verification |
224 | Annex D (informative) Criteria for choosing an adhesive bonding system |
227 | Annex E (informative) Description of non-destructive and destructive testing methods |
230 | Annex F (informative) Description of accelerating ageing tests |
234 | Annex G (informative) Examples of non-decorative and decorative imperfections of adhesive bonds |
236 | Annex H (informative) Example of a job history sheet |
237 | Annex I (informative) Notes on quality planning |
239 | Bibliography |