Shopping Cart

No products in the cart.

BS ISO 4917-6:2024

$102.76

Design of nuclear power plants against seismic events – Post-seismic measures

Published By Publication Date Number of Pages
BSI 2024 22
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. Weā€™re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
2 undefined
6 Foreword
7 Introduction
9 1 Scope
2 Normative references
3 Terms and definitions
10 4 Procedure
4.1 General requirements
4.2 Verification of the earthquake
11 4.3 Classification of the earthquake
4.4 Initial measures
4.4.1 Plant check-up from the control room and plant walk-down inspection (Figure 2, chart item 3)
12 4.4.2 Deviations caused by the earthquake (Figure 2, chart item 4)
4.4.3 Specified normal operation condition in accordance with the operating manual (Figure 2, chart item 5)
4.5 In-depth measures
4.5.1 General
4.5.2 Special/Seismic inspections and analyses (Figure 2, chart item 6)
13 4.5.3 Specified normal operation condition and permissible loads (Figure 2, chart item 7)
4.5.4 Shutdown inspection (Figure 2, chart item 9)
4.6 Resulting measures
4.6.1 Continued operation (Figure 2, chart item 8)
4.6.2 Shutting down the plant (Figure 2, chart item 10)
14 4.6.3 Additional procedures (Figure 2, chart item 11)
15 Annex A (informative) Derivation of factor, f
17 Annex B (informative) Directives for plant walk-down inspections
18 Annex C (informative) Special/Seismic inspections
20 Bibliography
BS ISO 4917-6:2024
$102.76